News
26/01/2024
KAMAZ expands the EFS network

KAMAZ continues development of the electric charging infrastructure. A charging station for electric vehicles appeared on the territory of the company's Scientific and Technical Center.

Work on the installation of electric filling stations will continue further. In March 2023, three more "slow" electric filling stations will appear on the territory of the KAMAZ general directorate, in April it is planned to install one "fast" electric filling station on the territory of the automobile plant (near PAO 408/1), in June 10 "slow" electric filling stations will be installed near the IT park. In August, a station for fast charging of electric vehicles will be located near the KAMAZ executive directorate.

NAPI (National Industrial Information Agency)


Назад
Other news from section:
19.06.2026
Becema has produced a batch of dumpers for Romanov JSC
Another batch of BECEMA FORMAT dumpers was manufactured on the BAZ 6x6 chassis. The body is made of reinforced wear-resistant steel, equipped with highly efficient heating system and a double bottom. Vehicles are designed to operate in the off-road conditions of the North and will be shipped to Romanov JSC. NAPI (National Industrial Information Agency)
19.06.2026
KAMAZ has launched a new tractor unit with CMU on the market
KAMAZ has launched a new modification of KAMAZ-65954 all-wheel drive tractor unit equipped with an Inman IM 240N crane manipulator unit. The novelty is a multi-purpose transport complex that combines capabilities of a tractor unit and a self-loader. This model is designed to transport heavy loads off-road and perform loading and unloading operations without involvement of third-party vehicles, which allows the carrier to reduce downtime and...
News archive