News
25/09/2025
The construction of a new production complex has been completed at the UralAZ

The construction of a modern production complex on the territory of the Ural Automobile Plant has been completed in Miass. According to 110km.ru with reference to the company's management, the main task of the new facility was to optimize the assembly process of various types of trucks.

According to the management, vehicles of varying degrees of production complexity roll off the assembly line of the enterprise. The new complex is designed for labor-intensive models, which take about 1,000 hours to produce. The design capacity of such assembly line is 5,500-6,000 vehicles per year. At the same time, the main workshop is capable of producing up to 20,000 trucks annually. As a result, the total production capacity of the enterprise has reached 25,500 vehicles per year.

NAPI (National Industrial Information Agency)


Назад
Other news from section:
28.10.2026
Citymax 8 passed trial operation in Tatarstan  
The 30-day trial operation of Citymax 8 bus (PAZ-320210) completed at the "Prigorod" company, which provides regular passenger transportation services in the Republic of Tatarstan. The bus operated on city routes of Zelenodolsk, with lengths of 234.8 km and 242.9 km. On the first route, it operated 32 flights a day, and on the second, 25 flights. Both routes passed through flat terrain. Citymax 8 is a mid-class bus developed by the Pavlovo...
27.10.2026
Chery Rely R08 became available in Russian dealerships 
According to Rossiyskaya Gazeta, sales of Chery Rely R08 pickup have started in the Russian Federation. One of the dealers is offering a car at the price of 4.3 million rubles when purchased in stock and from 3.1 million rubles when pre-ordered. The model is equipped with 2.3-liter Dongfeng diesel engine capacity of 163 HP and 420 Nm of torque, paired with 8-speed torque converter and all-wheel drive. The cabin is equipped with a 15.6-inch...
News archive