News
25/02/2022
Modernization of production at the KAMAZ foundry

Russian Automotive Market Research

The KAMAZ foundry continues reengineering production. Two of the three new Otto Junker furnaces have already been put into operation. According to the project, all old furnaces will have been replaced with new ones by 2025.

The Otto Junker furnace is an induction holding furnace with a capacity of 65 tons. The useful volume is 50 tons – this is how much the furnace can produce. And the remaining 15 tons are liquid metal, which is constantly in operation, since the furnace is never completely shut down.


Назад
Other news from section:
29.07.2025
TMP has successfully passed the inspection audit
The Tutaev Motor Plant, KAMAZ subsidiary in the Yaroslavl region, has successfully passed the next inspection audit of the Quality Management System for compliance with the requirements of GOST R ISO 9001-2015. The inspection control confirmed that the Quality Management System of TMP PTC complies with the requirements of GOST R ISO 9001-2015 in relation to the design, development, production, supply and warranty service of multi-purpose...
25.07.2025
GAZ extended the warranty period for GAZELLE Next bearings
The Gorky Automobile Plant has extended the warranty period for the hub bearings of Gazelle Next rear axle to three years or 150,000 km of mileage. Recall that earlier, the warranty period was 12 months or 40,000 km. The bearing was classified as a quick-wear part along with brake pads, lamps and silent blocks. NAPI (National Industrial Information Agency)
News archive